A $0.145
Price delayed by at least
20 minutes

   

Dunnsville Project

The Dunnsville project is located 70km west north-west of Kalgoorlie and 50km north-west of Coolgardie (Fig1).

                                                                                                                                           
Figure 1 Dunnsville Location Map

 

The Dunnsville Project consolidates a large tenement holding over a zone of structural complexity within a geological setting favourable for gold mineralisation. Matsa Resources’ activities have focused on investigating gold mineralisation related to regional structural lineaments in the central and western parts of the tenure.

The Dunnsville Project bosts a number of “greenfield” gold prospects, the most advanced of which is “BIG RED”. Big Red is centered on a 3.5km long soil gold anomaly with gold values up to 75ppb. Matsa completed a Sub-Audio Magnetic survey in 2010 to try to identify mineralising structures beneath the deep alluvial cover found at Big Red. Success led to follow up RAB drilling which identified 6 continuous zones of gold mineralisation beneath a 35m deep depletion zone (fig2 and table1).                                                                                                        
 
                                                                                                                              
Figure 2 Big Red SAM Survey
 
Hole_ID
From
To
Interval
Au g/t
10BRRAB134
32
33
1
1.43
10BRRAB147
59
60
1
6.33
10BRRAB148
46
47
1
1.09
10BRRAB155
51
52
1
7.85
10BRRAB169
43
44
1
1.63
10BRRAB187
47
48
1
4.84
10BRRAB189
53
54
1
1.4
10BRRAB190
58
62
4
1.06
10BRRAB190
61
62
1
1.36
10BRRAB191
56
57
1
2.99
10BRRAB197
52
55
3
1.67
10BRRAB205
14
15
1
1.34
10BRRAB206
58
59
1
2.15
10BRRAB217
50
51
1
1.22
10BRRAB220
49
50
1
1.83
Table 1, significant intersections for the Big Red RAB program.
 
Matsa was pleased to receive Department of Mineral Resources (Exploration Incentive Scheme) EIS funding to cover diamond drilling of a conceptual shear hosted gold target within the Big Red prospect.  Funding under the EIS will reimburse 50% of capped direct drilling costs for 4 diamond drill holes planned to test the target, see figure3.
                               
Figure 3 Planne EIS Diamond Drilling

 


 


   Our Projects
        Norseman Gold Project
        Dundas Iron Ore Project
        Paisali Iron Ore Project
        Siam Copper Project
        KT Gold Project
         Dunnsville Project

 

  Latest News

07 May 2012 Breakaway Research Report 07 May 2012.pdf
30 Apr 2012 Quarterly Report March 2012
15 Mar 2012 Half Yearly Report December 2011
29 Feb 2012 Placement & 708 Notice
31 Jan 2012 Quarterly Report December 2011
   



 

© 2012 Matsa Resources Limited ABN 48 106 732 487       Home | Contact Us | Site Map | Privacy Policy